Publication | Date of Publication | Type |
---|
A branch‐and‐price‐and‐cut algorithm for the truck‐drone routing problem with simultaneously delivery and pickup | 2024-03-06 | Paper |
An exact solution method for home health care scheduling with synchronized services | 2023-10-18 | Paper |
Two‐agent scheduling with linear resource‐dependent processing times | 2023-10-12 | Paper |
A branch-and-price-and-cut algorithm for the truck-based drone delivery routing problem with time windows | 2023-07-10 | Paper |
Robust optimization for the electric vehicle pickup and delivery problem with time windows and uncertain demands | 2023-07-04 | Paper |
Wasserstein distributionally robust chance-constrained program with moment information | 2023-07-04 | Paper |
Distributionally robust multi-period location-allocation with multiple resources and capacity levels in humanitarian logistics | 2022-12-12 | Paper |
Due date assignment and two-agent scheduling under multitasking environment | 2022-10-18 | Paper |
Single-machine serial-batch delivery scheduling with two competing agents and due date assignment | 2021-05-05 | Paper |
Rescheduling under disruptions in manufacturing systems. Models and algorithms | 2020-04-29 | Paper |
Due date-related scheduling with two agents. Models and algorithms | 2020-03-02 | Paper |
Two-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteria | 2019-12-30 | Paper |
A honey-bees optimization algorithm for a two-agent single-machine scheduling problem with ready times | 2019-12-03 | Paper |
Some generalized forms of fuzzy interval valued hyperideals in a hyperring | 2019-11-19 | Paper |
An exact branch‐and‐price algorithm for multitasking scheduling on unrelated parallel machines | 2019-09-17 | Paper |
Approximation schemes for single‐machine scheduling with a fixed maintenance activity to minimize the total amount of late work | 2019-05-02 | Paper |
CON/SLK due date assignment and scheduling on a single machine with two agents | 2019-05-02 | Paper |
A bicriterion approach to common flow allowances due window assignment and scheduling with controllable processing times | 2019-05-02 | Paper |
MRI appointment scheduling with uncertain examination time | 2019-04-30 | Paper |
Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents | 2019-03-01 | Paper |
Integrated production and multiple trips vehicle routing with time windows and uncertain travel times | 2018-12-17 | Paper |
Single-machine scheduling problems with a learning effect matrix | 2018-10-05 | Paper |
https://portal.mardi4nfdi.de/entity/Q4583728 | 2018-09-03 | Paper |
A two-agent single-machine scheduling problem to minimize the total cost with release dates | 2018-02-27 | Paper |
A two-machine flowshop scheduling problem with precedence constraint on two jobs | 2018-02-27 | Paper |
Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs | 2017-08-25 | Paper |
Parallel-machine scheduling with potential disruption and positional-dependent processing times | 2017-06-12 | Paper |
Single machine scheduling problem with two synergetic agents and piece-rate maintenance | 2016-12-07 | Paper |
An order scheduling problem with position-based learning effect | 2016-11-17 | Paper |
An investigation on a two-agent single-machine scheduling problem with unequal release dates | 2016-11-11 | Paper |
A tabu method for a two-agent single-machine scheduling with deterioration jobs | 2016-11-10 | Paper |
Rescheduling on identical parallel machines with machine disruptions to minimize total completion time | 2016-10-07 | Paper |
Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval | 2016-07-08 | Paper |
Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs | 2016-06-20 | Paper |
Prioritized surgery scheduling in face of surgeon tiredness and fixed off-duty period | 2015-11-03 | Paper |
A branch-and-bound algorithm for a single machine sequencing to minimize the total tardiness with arbitrary release dates and position-dependent learning effects | 2015-09-25 | Paper |
A single-machine scheduling with a truncated linear deterioration and ready times | 2015-09-25 | Paper |
Four single-machine scheduling problems involving due date determination decisions | 2015-09-24 | Paper |
Parallel-Machine Scheduling to Minimize Flowtime, Holding, and Batch Delivery Costs | 2015-02-17 | Paper |
Genetic Algorithm for a Two-Agent Scheduling Problem with Truncated Learning Consideration | 2015-02-17 | Paper |
https://portal.mardi4nfdi.de/entity/Q5496883 | 2015-01-28 | Paper |
https://portal.mardi4nfdi.de/entity/Q2932106 | 2014-11-28 | Paper |
https://portal.mardi4nfdi.de/entity/Q2932143 | 2014-11-28 | Paper |
https://portal.mardi4nfdi.de/entity/Q2923920 | 2014-11-03 | Paper |
The single-machine total tardiness problem with unequal release times and a linear deterioration | 2014-08-06 | Paper |
Two-agent single-machine scheduling with assignable due dates | 2014-07-04 | Paper |
https://portal.mardi4nfdi.de/entity/Q5412328 | 2014-04-25 | Paper |
https://portal.mardi4nfdi.de/entity/Q5405359 | 2014-04-02 | Paper |
Single-machine scheduling and due date assignment with rejection and position-dependent processing times | 2014-03-11 | Paper |
Single-machine scheduling with past-sequence-dependent delivery times and a linear deterioration | 2013-11-14 | Paper |
A time-dependent scheduling problem to minimize the sum of the total weighted tardiness among two agents | 2013-11-14 | Paper |
Characterizations of semihyperrings by their \((\epsilon_\gamma, \epsilon_\gamma \vee q_\delta)\)-fuzzy hyperideals | 2013-09-09 | Paper |
A new view of fuzzy k-ideals of hemirings | 2013-08-06 | Paper |
Notes on ``Vague soft sets and their properties | 2013-07-25 | Paper |
On algebraic structure of intuitionistic fuzzy soft sets | 2013-07-25 | Paper |
https://portal.mardi4nfdi.de/entity/Q4916793 | 2013-04-25 | Paper |
https://portal.mardi4nfdi.de/entity/Q4914101 | 2013-04-17 | Paper |
https://portal.mardi4nfdi.de/entity/Q4914115 | 2013-04-17 | Paper |
https://portal.mardi4nfdi.de/entity/Q4915519 | 2013-04-10 | Paper |
Single-machine common due window assignment and scheduling to minimize the total cost | 2013-03-13 | Paper |
https://portal.mardi4nfdi.de/entity/Q4900455 | 2013-01-24 | Paper |
https://portal.mardi4nfdi.de/entity/Q4898247 | 2012-12-30 | Paper |
The single-machine total weighted tardiness scheduling problem with position-based learning effects | 2012-11-15 | Paper |
Characterization of ordered semigroups in terms of fuzzy soft ideals | 2012-10-10 | Paper |
The \(\vartheta \)-lower and \(T\)-upper fuzzy rough approximation operators on a semigroup | 2012-10-10 | Paper |
Notes on ``Scheduling problems with general effects of deterioration and learning | 2012-10-10 | Paper |
Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties | 2012-10-02 | Paper |
Characterizations of \(h\)-intra- and \(h\)-quasi-hemiregular hemirings. | 2012-09-30 | Paper |
Generalized fuzzy n-ary subhypergroups of a commutative n-ary hypergroup | 2012-03-01 | Paper |
Vague soft hemirings | 2011-12-18 | Paper |
Erratum to ``Single-machine scheduling problems with both deteriorating jobs and learning effects [Appl. Math. Modelling 34 (2010) 2831-2839] | 2011-12-18 | Paper |
Erratum to ``Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects [Appl. Math. Modelling 35 (2011) 1388-1395] | 2011-12-18 | Paper |
Generalized intuitionistic fuzzy ideals of ordered semigroups | 2011-11-22 | Paper |
Notes on ``Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning | 2011-11-11 | Paper |
Comments on ``A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times | 2011-09-16 | Paper |
Notes on ``A bicriteria flowshop scheduling with a learning effect | 2011-09-16 | Paper |
Comments on ``A bicriteria parallel machine scheduling with a learning effect of setup and removal times | 2011-09-16 | Paper |
Erratum to ``minimizing total tardiness in a scheduling problem with a learning effect [Appl. Math. model. 31 (2007) 1351-1361] | 2011-09-16 | Paper |
Fuzzy \(H_{v}\)-ideals in \(\Gamma\)-\(H_{v}\)-rings | 2011-07-21 | Paper |
Redefined generalized fuzzy ideals of near-rings. | 2011-07-19 | Paper |
Notes on ``Some single-machine scheduling problems with general position-dependent and time-dependent learning effects | 2011-06-22 | Paper |
Comments on ``A bicriteria flowshop scheduling problem with setup times | 2011-04-19 | Paper |
Some single-machine scheduling problems with general effects of learning and deterioration | 2011-03-19 | Paper |
New types of fuzzy filters of BL-algebras | 2011-02-13 | Paper |
Single-machine scheduling with a general sum-of-actual-processing-times-based and job-position-based learning effect | 2010-12-14 | Paper |
The \((\in,\in\!\vee q)\)-fuzzy subsemigroups and ideals of an \((\in,\in\!\vee q)\)-fuzzy semigroup. | 2010-11-05 | Paper |
Comments on ``A note on minimizing maximum lateness in an \(m\)-machine scheduling problem with a learning effect | 2010-10-25 | Paper |
Scheduling jobs under increasing linear machine maintenance time | 2010-10-08 | Paper |
https://portal.mardi4nfdi.de/entity/Q3589295 | 2010-09-20 | Paper |
https://portal.mardi4nfdi.de/entity/Q3577532 | 2010-07-22 | Paper |
The \(L\)-fuzzy hypermodules. | 2010-06-28 | Paper |
https://portal.mardi4nfdi.de/entity/Q3551350 | 2010-04-15 | Paper |
The characterization of regular hemirings. | 2010-02-12 | Paper |
Approaches to knowledge reduction of covering decision systems based on information theory | 2009-08-14 | Paper |
https://portal.mardi4nfdi.de/entity/Q5193105 | 2009-08-10 | Paper |
https://portal.mardi4nfdi.de/entity/Q5193119 | 2009-08-10 | Paper |
Some scheduling problems with general position-dependent and time-dependent learning effects | 2009-07-22 | Paper |
https://portal.mardi4nfdi.de/entity/Q3629112 | 2009-05-26 | Paper |
A note on ``scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan | 2009-04-30 | Paper |
Makespan minimization for two parallel machines scheduling with a periodic availability constraint | 2009-02-12 | Paper |
https://portal.mardi4nfdi.de/entity/Q3598485 | 2009-02-03 | Paper |
The characterizations of \(h\)-hemiregular hemirings and \(h\)-intra-hemiregular hemirings. | 2008-09-05 | Paper |
https://portal.mardi4nfdi.de/entity/Q3520613 | 2008-08-26 | Paper |
The fuzzy point power ring | 2008-06-03 | Paper |
The fuzzy prime ideals in fuzzy semigroups based on fuzzy points. | 2008-06-03 | Paper |
Note on ``Generalized fuzzy interior ideals in semigroups. | 2008-01-03 | Paper |
(\(\vartheta, T\))-fuzzy rough approximation operators and the \(TL\)-fuzzy rough ideals on a ring | 2007-10-10 | Paper |
https://portal.mardi4nfdi.de/entity/Q3594174 | 2007-08-07 | Paper |
https://portal.mardi4nfdi.de/entity/Q3415434 | 2007-01-19 | Paper |