| Publication | Date of Publication | Type |
|---|
| Dynamic travel time prediction with spatiotemporal features: using a GNN-based deep learning method | 2024-09-10 | Paper |
| An improved transformer model with multi-head attention and attention to attention for low-carbon multi-depot vehicle routing problem | 2024-08-19 | Paper |
| Exact solution method for vehicle-and-drone cooperative delivery routing of blood products | 2024-06-06 | Paper |
| A branch‐and‐price‐and‐cut algorithm for the truck‐drone routing problem with simultaneously delivery and pickup | 2024-03-06 | Paper |
| An exact solution method for home health care scheduling with synchronized services | 2023-10-18 | Paper |
| Two‐agent scheduling with linear resource‐dependent processing times | 2023-10-12 | Paper |
| A branch-and-price-and-cut algorithm for the truck-based drone delivery routing problem with time windows | 2023-07-10 | Paper |
| Robust optimization for the electric vehicle pickup and delivery problem with time windows and uncertain demands | 2023-07-04 | Paper |
| Wasserstein distributionally robust chance-constrained program with moment information | 2023-07-04 | Paper |
| Distributionally robust multi-period location-allocation with multiple resources and capacity levels in humanitarian logistics | 2022-12-12 | Paper |
| Due date assignment and two-agent scheduling under multitasking environment | 2022-10-18 | Paper |
| Single-machine serial-batch delivery scheduling with two competing agents and due date assignment | 2021-05-05 | Paper |
| Rescheduling under disruptions in manufacturing systems. Models and algorithms | 2020-04-29 | Paper |
| Due date-related scheduling with two agents. Models and algorithms | 2020-03-02 | Paper |
| Two-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteria | 2019-12-30 | Paper |
| A honey-bees optimization algorithm for a two-agent single-machine scheduling problem with ready times | 2019-12-03 | Paper |
| Some generalized forms of fuzzy interval valued hyperideals in a hyperring | 2019-11-19 | Paper |
| An exact branch-and-price algorithm for multitasking scheduling on unrelated parallel machines | 2019-09-17 | Paper |
| A bicriterion approach to common flow allowances due window assignment and scheduling with controllable processing times | 2019-05-02 | Paper |
| Approximation schemes for single-machine scheduling with a fixed maintenance activity to minimize the total amount of late work | 2019-05-02 | Paper |
| \(CON/SLK\) due date assignment and scheduling on a single machine with two agents | 2019-05-02 | Paper |
| MRI appointment scheduling with uncertain examination time | 2019-04-30 | Paper |
| Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents | 2019-03-01 | Paper |
| Integrated production and multiple trips vehicle routing with time windows and uncertain travel times | 2018-12-17 | Paper |
| Single-machine scheduling problems with a learning effect matrix | 2018-10-05 | Paper |
| General forms of \((\alpha, \beta)\)-fuzzy subhypergroups of hypergroups | 2018-09-03 | Paper |
| A two-machine flowshop scheduling problem with precedence constraint on two jobs | 2018-02-27 | Paper |
| A two-agent single-machine scheduling problem to minimize the total cost with release dates | 2018-02-27 | Paper |
| Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs | 2017-08-25 | Paper |
| Parallel-machine scheduling with potential disruption and positional-dependent processing times | 2017-06-12 | Paper |
| Single machine scheduling problem with two synergetic agents and piece-rate maintenance | 2016-12-07 | Paper |
| An order scheduling problem with position-based learning effect | 2016-11-17 | Paper |
| An investigation on a two-agent single-machine scheduling problem with unequal release dates | 2016-11-11 | Paper |
| A tabu method for a two-agent single-machine scheduling with deterioration jobs | 2016-11-10 | Paper |
| Rescheduling on identical parallel machines with machine disruptions to minimize total completion time | 2016-10-07 | Paper |
| Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval | 2016-07-08 | Paper |
| Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs | 2016-06-20 | Paper |
| Prioritized surgery scheduling in face of surgeon tiredness and fixed off-duty period | 2015-11-03 | Paper |
| A branch-and-bound algorithm for a single machine sequencing to minimize the total tardiness with arbitrary release dates and position-dependent learning effects | 2015-09-25 | Paper |
| A single-machine scheduling with a truncated linear deterioration and ready times | 2015-09-25 | Paper |
| Four single-machine scheduling problems involving due date determination decisions | 2015-09-24 | Paper |
| Parallel-machine scheduling to minimize flowtime, holding, and batch delivery costs | 2015-02-17 | Paper |
| Genetic algorithm for a two-agent scheduling problem with truncated learning consideration | 2015-02-17 | Paper |
| New characterizations of \(h\)-semisimple hemirings. | 2015-01-28 | Paper |
| Interval-valued fuzzy \(h\)-ideals of \(\Gamma\)-hemirings. | 2014-11-28 | Paper |
| A new view of fuzzy ideals in rings. | 2014-11-28 | Paper |
| Generalized intuitionistic fuzzy ideals of an ordered semigroup. | 2014-11-03 | Paper |
| The single-machine total tardiness problem with unequal release times and a linear deterioration | 2014-08-06 | Paper |
| Two-agent single-machine scheduling with assignable due dates | 2014-07-04 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5412328 | 2014-04-25 | Paper |
| Intuitionistic fuzzy soft semigroups. | 2014-04-02 | Paper |
| Single-machine scheduling and due date assignment with rejection and position-dependent processing times | 2014-03-11 | Paper |
| Single-machine scheduling with past-sequence-dependent delivery times and a linear deterioration | 2013-11-14 | Paper |
| A time-dependent scheduling problem to minimize the sum of the total weighted tardiness among two agents | 2013-11-14 | Paper |
| Characterizations of semihyperrings by their \((\epsilon_\gamma, \epsilon_\gamma \vee q_\delta)\)-fuzzy hyperideals | 2013-09-09 | Paper |
| A new view of fuzzy \(k\)-ideals of hemirings. | 2013-08-06 | Paper |
| Notes on ``Vague soft sets and their properties | 2013-07-25 | Paper |
| On algebraic structure of intuitionistic fuzzy soft sets | 2013-07-25 | Paper |
| Bipolar fuzzy Lie superalgebras | 2013-04-25 | Paper |
| More general forms of \((\alpha, \beta)\)-fuzzy ideals of ordered semigroups | 2013-04-17 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4914115 | 2013-04-17 | Paper |
| A new way to fuzzy \(h\)-ideals of hemirings. | 2013-04-10 | Paper |
| Single-machine common due window assignment and scheduling to minimize the total cost | 2013-03-13 | Paper |
| Fuzzy soft polygroups. | 2013-01-24 | Paper |
| More general forms of generalized fuzzy bi-ideals in semigroups | 2012-12-30 | Paper |
| The single-machine total weighted tardiness scheduling problem with position-based learning effects | 2012-11-15 | Paper |
| Characterization of ordered semigroups in terms of fuzzy soft ideals | 2012-10-10 | Paper |
| The \(\vartheta \)-lower and \(T\)-upper fuzzy rough approximation operators on a semigroup | 2012-10-10 | Paper |
| Notes on ``Scheduling problems with general effects of deterioration and learning | 2012-10-10 | Paper |
| Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties | 2012-10-02 | Paper |
| Characterizations of \(h\)-intra- and \(h\)-quasi-hemiregular hemirings. | 2012-09-30 | Paper |
| Generalized fuzzy \(n\)-ary subhypergroups of a commutative \(n\)-ary hypergroup. | 2012-03-01 | Paper |
| Erratum to ``Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects [Appl. Math. Modelling 35 (2011) 1388-1395] | 2011-12-18 | Paper |
| Erratum to ``Single-machine scheduling problems with both deteriorating jobs and learning effects [Appl. Math. Modelling 34 (2010) 2831-2839] | 2011-12-18 | Paper |
| Vague soft hemirings | 2011-12-18 | Paper |
| Generalized intuitionistic fuzzy ideals of ordered semigroups | 2011-11-22 | Paper |
| Notes on ``Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning | 2011-11-11 | Paper |
| Comments on ``A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times | 2011-09-16 | Paper |
| Comments on ``A bicriteria parallel machine scheduling with a learning effect of setup and removal times | 2011-09-16 | Paper |
| Notes on ``A bicriteria flowshop scheduling with a learning effect | 2011-09-16 | Paper |
| Erratum to ``minimizing total tardiness in a scheduling problem with a learning effect [Appl. Math. model. 31 (2007) 1351-1361] | 2011-09-16 | Paper |
| Fuzzy \(H_{v}\)-ideals in \(\Gamma\)-\(H_{v}\)-rings | 2011-07-21 | Paper |
| Redefined generalized fuzzy ideals of near-rings. | 2011-07-19 | Paper |
| Notes on ``Some single-machine scheduling problems with general position-dependent and time-dependent learning effects | 2011-06-22 | Paper |
| Comments on ``A bicriteria flowshop scheduling problem with setup times | 2011-04-19 | Paper |
| Some single-machine scheduling problems with general effects of learning and deterioration | 2011-03-19 | Paper |
| New types of fuzzy filters of BL-algebras | 2011-02-13 | Paper |
| Single-machine scheduling with a general sum-of-actual-processing-times-based and job-position-based learning effect | 2010-12-14 | Paper |
| The \((\in,\in\!\vee q)\)-fuzzy subsemigroups and ideals of an \((\in,\in\!\vee q)\)-fuzzy semigroup. | 2010-11-05 | Paper |
| Comments on ``A note on minimizing maximum lateness in an \(m\)-machine scheduling problem with a learning effect | 2010-10-25 | Paper |
| Scheduling jobs under increasing linear machine maintenance time | 2010-10-08 | Paper |
| The characterization of regular order semigroups | 2010-09-20 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3577532 | 2010-07-22 | Paper |
| The \(L\)-fuzzy hypermodules. | 2010-06-28 | Paper |
| Intuitionistic fuzzy ideals with thresholds \((\alpha,\beta)\) of rings. | 2010-04-15 | Paper |
| The characterization of regular hemirings. | 2010-02-12 | Paper |
| Approaches to knowledge reduction of covering decision systems based on information theory | 2009-08-14 | Paper |
| The characterization of regular and intra-regular ordered semigroups | 2009-08-10 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5193105 | 2009-08-10 | Paper |
| Some scheduling problems with general position-dependent and time-dependent learning effects | 2009-07-22 | Paper |
| The \((\in,\in\!\vee q\))-fuzzy prime ideals and maximal ideals of a semigroup. | 2009-05-26 | Paper |
| A note on ``scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan | 2009-04-30 | Paper |
| Makespan minimization for two parallel machines scheduling with a periodic availability constraint | 2009-02-12 | Paper |
| The \((\in,\in\!\vee q)\)-fuzzy ideals of a semigroup. | 2009-02-03 | Paper |
| The characterizations of \(h\)-hemiregular hemirings and \(h\)-intra-hemiregular hemirings. | 2008-09-05 | Paper |
| The properties and structures of fuzzy power monoid. | 2008-08-26 | Paper |
| The fuzzy point power ring | 2008-06-03 | Paper |
| The fuzzy prime ideals in fuzzy semigroups based on fuzzy points. | 2008-06-03 | Paper |
| Note on ``Generalized fuzzy interior ideals in semigroups. | 2008-01-03 | Paper |
| (\(\vartheta, T\))-fuzzy rough approximation operators and the \(TL\)-fuzzy rough ideals on a ring | 2007-10-10 | Paper |
| The pointwise fuzzy maximal ideals in fuzzy semigroups. | 2007-08-07 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3415434 | 2007-01-19 | Paper |