MRI appointment scheduling with uncertain examination time
DOI10.1007/S10878-017-0210-5zbMATH Open1416.90012OpenAlexW2769629653MaRDI QIDQ1740397FDOQ1740397
Authors: Huaxin Qiu, Yunqiang Yin, Du-Juan Wang, Yanzhang Wang
Publication date: 30 April 2019
Published in: Journal of Combinatorial Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10878-017-0210-5
Recommendations
appointment schedulingmulti-objective evolutionary algorithmsupport vector regressionduration uncertainty
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Stochastic programming (90C15) Integer programming (90C10)
Cites Work
- Operating room planning and scheduling: a literature review
- Operating room pooling and parallel surgery processing under uncertainty
- Scheduling the hospital-wide flow of elective patients
- A simulation based approximate dynamic programming approach to multi-class, multi-resource surgical scheduling
- Iterated local search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness
- Scheduling operating rooms: achievements, challenges and pitfalls
- A multiobjective evolutionary algorithm based on decomposition with normal boundary intersection for traffic grooming in optical networks
- Prioritized surgery scheduling in face of surgeon tiredness and fixed off-duty period
- A surgical scheduling method considering surgeons' preferences
Cited In (9)
- Online appointment scheduling for a nuclear medicine department in a Chinese hospital
- A heuristic algorithm for the hospital health examination scheduling problem
- Appointment scheduling for medical diagnostic centers considering time-sensitive pharmaceuticals: a dynamic robust optimization approach
- A variable neighborhood search algorithm for a PET/CT examination scheduling problem considering multi-stage process and deteriorating effect
- Implementation strategies of a contract-based MRI examination reservation process for stroke patients
- Value management of diagnostic equipment with cancelation, no-show, and emergency patients
- Optimal grouping for a nuclear magnetic resonance scanner by means of an open queueing model.
- Stateless two-stage multiple criteria scheduling in nuclear medicine
- Managing Patient Service in a Diagnostic Medical Facility
Uses Software
This page was built for publication: MRI appointment scheduling with uncertain examination time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1740397)