Approximations to production lot sizing with machine breakdowns.
From MaRDI portal
Publication:1422343
DOI10.1016/S0305-0548(02)00079-5zbMath1039.90014MaRDI QIDQ1422343
Publication date: 14 February 2004
Published in: Computers \& Operations Research (Search for Journal in Brave)
Related Items (7)
Computational aspects of an extended EMQ model with variable production rate ⋮ Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns ⋮ Modeling an inventory problem with random supply, inspection and machine breakdown ⋮ A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering ⋮ Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown ⋮ Numerical method for determination of reworking or scraping the defective items in a finite production rate model ⋮ Robust planning in optimization for production system subject to random machine breakdown and failure in rework
Cites Work
This page was built for publication: Approximations to production lot sizing with machine breakdowns.