On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown
From MaRDI portal
Publication:1630160
Recommendations
- A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
- Approximations to production lot sizing with machine breakdowns.
- Economic production quantity model with repair failure and limited capacity
Cites work
- A production-inventory model with probabilistic deterioration in two-echelon supply chain management
- An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework
- scientific article; zbMATH DE number 3562783 (Why is no real title available?)
- Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
Cited in
(10)- Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair
- A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Approximations to production lot sizing with machine breakdowns.
- Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management
- Heuristics for the economic production quantity problem under restrictions on production and maintenance time
- Modeling an inventory problem with random supply, inspection and machine breakdown
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items
- The economic production quantity with rework process in supply chain management
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework
This page was built for publication: On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1630160)