Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework
From MaRDI portal
Publication:990778
Recommendations
- Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
- A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown
- The algorithm to locate the optimal solution for production system subject to random machine breakdown and failure in rework for supply chain management
Cites work
Cited in
(8)- The complete solution procedure for the EOQ and EPQ inventory models with linear and fixed backorder costs
- A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management
- Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments
- Product recovery in stochastic remanufacturing systems with multiple reuse options
- The algorithm to locate the optimal solution for production system subject to random machine breakdown and failure in rework for supply chain management
- Joint determination of optimal safety stocks and production policy for an imperfect production system
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
This page was built for publication: Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q990778)