Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework
From MaRDI portal
Publication:990778
DOI10.1016/J.AML.2010.03.023zbMATH Open1230.90076OpenAlexW2061849220MaRDI QIDQ990778FDOQ990778
Authors: Yuan-Shyi Peter Chiu, Feng-Tsung Cheng, Huei-Hsin Chang
Publication date: 1 September 2010
Published in: Applied Mathematics Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.aml.2010.03.023
Recommendations
- Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
- A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown
- The algorithm to locate the optimal solution for production system subject to random machine breakdown and failure in rework for supply chain management
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Cites Work
Cited In (7)
- A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management
- Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments
- Product recovery in stochastic remanufacturing systems with multiple reuse options
- The complete solution procedure for the EOQ and EPQ inventory models with linear and fixed backorder costs
- Joint determination of optimal safety stocks and production policy for an imperfect production system
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
This page was built for publication: Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q990778)