| Publication | Date of Publication | Type |
|---|
On mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework Far East Journal of Mathematical Sciences (FJMS) | 2018-01-24 | Paper |
Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments Applied Mathematics Letters | 2012-10-17 | Paper |
Solving production lot size problem with an improved delivery policy and failure in rework by a simplified solution procedure Journal of Information & Optimization Sciences | 2012-08-08 | Paper |
Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period Mathematical & Computational Applications | 2012-05-30 | Paper |
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments Mathematical and Computer Modelling | 2012-04-15 | Paper |
Solving finite production rate model with scrap and multiple deliveries Journal of Information and Optimization Sciences | 2011-08-04 | Paper |
Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance Mathematical and Computer Modelling of Dynamical Systems | 2011-02-03 | Paper |
The effect of service level constraint on EPQ model with random defective rate Mathematical Problems in Engineering | 2010-12-01 | Paper |
Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework Applied Mathematics Letters | 2010-09-01 | Paper |
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown Computers & Mathematics with Applications | 2010-06-28 | Paper |
A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns European Journal of Operational Research | 2009-11-16 | Paper |
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging Computers & Mathematics with Applications | 2009-07-17 | Paper |
Solving an EPQ model with rework and service level constraint Mathematical & Computational Applications | 2007-10-26 | Paper |
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns European Journal of Operational Research | 2007-03-08 | Paper |
Numerical method for determination of reworking or scraping the defective items in a finite production rate model Communications in Numerical Methods in Engineering | 2006-05-23 | Paper |
A modification of the least unit cost lot-sizing heuristic Journal of Statistics and Management Systems | 2005-01-31 | Paper |
Materials procurement decision-making based on the economic order quantity model and the economic production quantity model Journal of Statistics and Management Systems | 2005-01-11 | Paper |
A finite production model with random defective rate and shortages allowed and backordered Journal of Information and Optimization Sciences | 2004-06-14 | Paper |
An economic production quantity model with the rework process of repairable defective items Journal of Information and Optimization Sciences | 2004-06-14 | Paper |