Yuan-Shyi Peter Chiu

From MaRDI portal



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
On mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework
Far East Journal of Mathematical Sciences (FJMS)
2018-01-24Paper
Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments
Applied Mathematics Letters
2012-10-17Paper
Solving production lot size problem with an improved delivery policy and failure in rework by a simplified solution procedure
Journal of Information & Optimization Sciences
2012-08-08Paper
Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period
Mathematical & Computational Applications
2012-05-30Paper
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
Mathematical and Computer Modelling
2012-04-15Paper
Solving finite production rate model with scrap and multiple deliveries
Journal of Information and Optimization Sciences
2011-08-04Paper
Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance
Mathematical and Computer Modelling of Dynamical Systems
2011-02-03Paper
The effect of service level constraint on EPQ model with random defective rate
Mathematical Problems in Engineering
2010-12-01Paper
Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework
Applied Mathematics Letters
2010-09-01Paper
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
Computers & Mathematics with Applications
2010-06-28Paper
A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
European Journal of Operational Research
2009-11-16Paper
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
Computers & Mathematics with Applications
2009-07-17Paper
Solving an EPQ model with rework and service level constraint
Mathematical & Computational Applications
2007-10-26Paper
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
European Journal of Operational Research
2007-03-08Paper
Numerical method for determination of reworking or scraping the defective items in a finite production rate model
Communications in Numerical Methods in Engineering
2006-05-23Paper
A modification of the least unit cost lot-sizing heuristic
Journal of Statistics and Management Systems
2005-01-31Paper
Materials procurement decision-making based on the economic order quantity model and the economic production quantity model
Journal of Statistics and Management Systems
2005-01-11Paper
A finite production model with random defective rate and shortages allowed and backordered
Journal of Information and Optimization Sciences
2004-06-14Paper
An economic production quantity model with the rework process of repairable defective items
Journal of Information and Optimization Sciences
2004-06-14Paper


Research outcomes over time


This page was built for person: Yuan-Shyi Peter Chiu