Yuan-Shyi Peter Chiu

From MaRDI portal
Person:409869


List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
On mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework
Far East Journal of Mathematical Sciences (FJMS)
2018-01-24Paper
Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments
Applied Mathematics Letters
2012-10-17Paper
Solving production lot size problem with an improved delivery policy and failure in rework by a simplified solution procedure
Journal of Information \& Optimization Sciences
2012-08-08Paper
Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period
Mathematical \& Computational Applications
2012-05-30Paper
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
Mathematical and Computer Modelling
2012-04-15Paper
Solving finite production rate model with scrap and multiple deliveries
Journal of Information and Optimization Sciences
2011-08-04Paper
Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance
Mathematical and Computer Modelling of Dynamical Systems
2011-02-03Paper
The effect of service level constraint on EPQ model with random defective rate
Mathematical Problems in Engineering
2010-12-01Paper
Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework
Applied Mathematics Letters
2010-09-01Paper
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
Computers & Mathematics with Applications
2010-06-28Paper
A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
European Journal of Operational Research
2009-11-16Paper
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
Computers & Mathematics with Applications
2009-07-17Paper
Solving an EPQ model with rework and service level constraint
Mathematical \& Computational Applications
2007-10-26Paper
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
European Journal of Operational Research
2007-03-08Paper
Numerical method for determination of reworking or scraping the defective items in a finite production rate model
Communications in Numerical Methods in Engineering
2006-05-23Paper
A modification of the least unit cost lot-sizing heuristic
Journal of Statistics and Management Systems
2005-01-31Paper
Materials procurement decision-making based on the economic order quantity model and the economic production quantity model
Journal of Statistics and Management Systems
2005-01-11Paper
A finite production model with random defective rate and shortages allowed and backordered
Journal of Information and Optimization Sciences
2004-06-14Paper
An economic production quantity model with the rework process of repairable defective items
Journal of Information and Optimization Sciences
2004-06-14Paper


Research outcomes over time


This page was built for person: Yuan-Shyi Peter Chiu