Solving production lot size problem with an improved delivery policy and failure in rework by a simplifi ed solution procedure
From MaRDI portal
Publication:2903240
DOI10.1080/02522667.2011.10700117zbMath1244.90084OpenAlexW2068597567MaRDI QIDQ2903240
No author found.
Publication date: 8 August 2012
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: http://www.connectjournals.com/file_html_pdf/1268306H_01_JIOS_T119_32-6_pp1253-1258a.pdf
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Cites Work
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
- A dynamic lot sizing model with exponential machine breakdowns
- Optimal strategy for the integrated vendor-buyer inventory model
- Production lot size problem with failure in repair and backlogging derived without derivatives
- Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries
- Inventory control of defective products when the demand is partially captive
- The Structure of Periodic Review Policies in the Presence of Random Yield
This page was built for publication: Solving production lot size problem with an improved delivery policy and failure in rework by a simplifi ed solution procedure