A dynamic lot sizing model with exponential machine breakdowns
From MaRDI portal
Publication:1278130
DOI10.1016/S0377-2217(96)00136-1zbMath0918.90080OpenAlexW2062212946MaRDI QIDQ1278130
Publication date: 1997
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00136-1
Related Items
Solving production lot size problem with an improved delivery policy and failure in rework by a simplifi ed solution procedure, Modeling an inventory problem with random supply, inspection and machine breakdown, Single-item dynamic lot-sizing problems: an updated survey, Modeling industrial lot sizing problems: a review, A capacitated lot sizing problem with stochastic setup times and overtime, On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time, Determining optimal lot size problem with rework and multiple deliveries using algebraic approach, An EMQ model in an imperfect production process, Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown, Robust planning in optimization for production system subject to random machine breakdown and failure in rework
Cites Work
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures
- Dynamic Version of the Economic Lot Size Model
- Production Lot Sizing with Machine Breakdowns
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Unnamed Item
- Unnamed Item
- Unnamed Item