Solving finite production rate model with scrap and multiple deliveries
From MaRDI portal
Publication:3020587
DOI10.1080/02522667.2010.10700035zbMATH Open1218.90075OpenAlexW2335013376MaRDI QIDQ3020587FDOQ3020587
Jyh-Chau Yang, Yuan-Shyi Peter Chiu, Chia-Kuan Ting
Publication date: 4 August 2011
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: http://www.connectjournals.com/file_html_pdf/926806H_JIOS_31_6_62_1395-1401A.pdf
Recommendations
- Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance
- Determining the optimal lot size for the finite production model with an imperfect rework process of defective items
- Production-shipment policy for EPQ model with quality assurance and an improved delivery schedule
- Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments
- Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint
Cites Work
Cited In (1)
This page was built for publication: Solving finite production rate model with scrap and multiple deliveries
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3020587)