Production-Inventory Systems with Unreliable Machines

From MaRDI portal
Publication:4287605

DOI10.1287/opre.42.1.111zbMath0798.90074OpenAlexW2025057553MaRDI QIDQ4287605

No author found.

Publication date: 12 April 1994

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.42.1.111




Related Items

Cost and quality of service analysis of production systems based on the cumulative downtimeA note on optimal replenishment policy for imperfect quality EMQ model with rework and backloggingA production-inventory model with randomly changing environmental conditionsDetermining the optimal run time for EPQ model with scrap, rework, and stochastic breakdownsOptimal and simple approximate solutions to a production-inventory system with stochastic and deterministic demandMathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipmentsA note on a production control model for a facility with limited storage capacity in a random environmentA constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backorderingProduction lot sizing with process deterioration and machine breakdownProduction lot size problem with failure in repair and backlogging derived without derivativesUnreliable production-inventory systems with hyper-exponential renewal demand processesOptimization of the finite production rate model with scrap, rework and stochastic machine breakdownMathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assuranceIntegrating quality and maintenance decisions in a production-inventory model for deteriorating itemsNumerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and reworkStochastic manufacturing system with process deterioration and machine breakdownUnreliable production-inventory model with a two-phase Erlang demand arrival processSupply interruptions in a lost-sales inventory system with random lead timeAn optimal production run time with imperfect production processes and allowable shortages