Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
DOI10.1016/J.MCM.2011.05.025zbMATH Open1235.90007OpenAlexW1970436584MaRDI QIDQ409873FDOQ409873
Shang-Chih Liu, Yuan-Shyi Peter Chiu, Huei-Hsin Chang, C. L. Chiu
Publication date: 15 April 2012
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.mcm.2011.05.025
Recommendations
- Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments
- An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments
- On mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework
- Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
- Determining optimal price, replenishment lot size and number of shipments for an EPQ model with rework and multiple shipments
- A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
- Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments
- Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework
- A Multiechelon Inventory Model with Fixed Replenishment Intervals
mathematical modellinglot sizemultiple shipmentsreplenishment policyproduction systemsimperfect reworkEMQ modelrandom defective
Cites Work
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Title not available (Why is that?)
- A one-vendor multi-buyer integrated inventory model
- Title not available (Why is that?)
- A single-vendor and multiple-buyers production-inventory policy for a deteriorating item
- A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
- Optimal strategy for the integrated vendor-buyer inventory model
- A collaborative inventory system with permissible delay in payment for deteriorating items
- Multi-item inventory models with price dependent demand under flexibility and reliability consideration and imprecise space constraint: A geometric programming approach
- Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- Supply-chain coordination model with insufficient production capacity and option for outsourcing
- Multistage Production to Order with Rework Capability
- Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown
- Economic manufacturing quantity in a just-in-time delivery system
- Production-Inventory Systems with Unreliable Machines
- Backtracking and its Amoebic Properties in One-dimensional Machine Location Problems
- Title not available (Why is that?)
- Optimal Operating Policy for a Bottleneck with Random Rework
- A joint economic-lot-size model for purchaser and vendor in fuzzy sense
Cited In (11)
- Stochastic inventory models with reworks
- Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
- An economic production quantity model with non-synchronized screening and rework
- Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments
- Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair
- Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments
- An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments
- An alternative approach to solving cost minimization problem with Cobb-Douglas technology
- Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system
- Optimization of inventory system with defects, rework failure and two types of errors under crisp and fuzzy approach
- Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework
This page was built for publication: Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q409873)