Singa Wang Chiu

From MaRDI portal
Person:424022

Available identifiers

zbMath Open chiu.singa-wangMaRDI QIDQ424022

List of research outcomes





PublicationDate of PublicationType
Production–shipment policy for EPQ model with quality assurance and an improved delivery schedule2014-12-22Paper
Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments2012-10-17Paper
A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework2012-08-08Paper
Replenishment lot size and number of shipments for EPQ model derived without derivatives2012-05-30Paper
Joint determination of the production lot size and number of shipments for EPQ model with rework2012-05-30Paper
Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework2011-12-21Paper
Determining optimal lot size problem with rework and multiple deliveries using algebraic approach2011-08-04Paper
An algebraic approach for determining the optimal lot size for EPQ model with rework process2010-08-27Paper
An optimization problem of manufacturing systems with stochastic machine breakdown and rework process2010-04-22Paper
Robust planning in optimization for production system subject to random machine breakdown and failure in rework2009-12-22Paper
Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown2009-08-18Paper
Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair2009-04-14Paper
Production lot size problem with failure in repair and backlogging derived without derivatives2008-02-13Paper
Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging2007-12-16Paper
Solving an EPQ model with rework and service level constraint2007-10-26Paper
Determining the optimal lot size for the finite production model with an imperfect rework process of defective items2007-07-02Paper
Effect of repair cost on the rework decision-making in an economic production quantity model2007-06-25Paper
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns2007-03-08Paper
Numerical method for determination of reworking or scraping the defective items in a finite production rate model2006-05-23Paper
Materials procurement decision-making based on the economic order quantity model and the economic production quantity model2005-01-11Paper
A finite production model with random defective rate and shortages allowed and backordered2004-06-14Paper
An economic production quantity model with the rework process of repairable defective items2004-06-14Paper

Research outcomes over time

This page was built for person: Singa Wang Chiu