| Publication | Date of Publication | Type |
|---|
Production-shipment policy for EPQ model with quality assurance and an improved delivery schedule Mathematical and Computer Modelling of Dynamical Systems | 2014-12-22 | Paper |
Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments Applied Mathematics Letters | 2012-10-17 | Paper |
A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework Journal of Information & Optimization Sciences | 2012-08-08 | Paper |
Replenishment lot size and number of shipments for EPQ model derived without derivatives Mathematical & Computational Applications | 2012-05-30 | Paper |
Joint determination of the production lot size and number of shipments for EPQ model with rework Mathematical & Computational Applications | 2012-05-30 | Paper |
Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework International Journal for Numerical Methods in Biomedical Engineering | 2011-12-21 | Paper |
Determining optimal lot size problem with rework and multiple deliveries using algebraic approach Journal of Information and Optimization Sciences | 2011-08-04 | Paper |
An algebraic approach for determining the optimal lot size for EPQ model with rework process Mathematical & Computational Applications | 2010-08-27 | Paper |
An optimization problem of manufacturing systems with stochastic machine breakdown and rework process Applied Stochastic Models in Business and Industry | 2010-04-22 | Paper |
Robust planning in optimization for production system subject to random machine breakdown and failure in rework Computers & Operations Research | 2009-12-22 | Paper |
Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown Mathematical and Computer Modelling of Dynamical Systems | 2009-08-18 | Paper |
Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair Mathematical & Computational Applications | 2009-04-14 | Paper |
Production lot size problem with failure in repair and backlogging derived without derivatives European Journal of Operational Research | 2008-02-13 | Paper |
Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging Applied Stochastic Models in Business and Industry | 2007-12-16 | Paper |
Solving an EPQ model with rework and service level constraint Mathematical & Computational Applications | 2007-10-26 | Paper |
Determining the optimal lot size for the finite production model with an imperfect rework process of defective items Journal of Information and Optimization Sciences | 2007-07-02 | Paper |
Effect of repair cost on the rework decision-making in an economic production quantity model Journal of Information and Optimization Sciences | 2007-06-25 | Paper |
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns European Journal of Operational Research | 2007-03-08 | Paper |
Numerical method for determination of reworking or scraping the defective items in a finite production rate model Communications in Numerical Methods in Engineering | 2006-05-23 | Paper |
Materials procurement decision-making based on the economic order quantity model and the economic production quantity model Journal of Statistics and Management Systems | 2005-01-11 | Paper |
A finite production model with random defective rate and shortages allowed and backordered Journal of Information and Optimization Sciences | 2004-06-14 | Paper |
An economic production quantity model with the rework process of repairable defective items Journal of Information and Optimization Sciences | 2004-06-14 | Paper |