A disruption recovery plan in a three-stage production-inventory system
DOI10.1016/J.COR.2014.12.003zbMATH Open1348.90036OpenAlexW2074382970MaRDI QIDQ337485FDOQ337485
Daryl Essam, Ruhul Sarker, Sanjoy Kumar Paul
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2014.12.003
Recommendations
- Real time disruption management for a two-stage batch production-inventory system with reliability considerations
- Disruption management in production planning
- An inventory model for interrupted multi-stage production
- Analysis of a Production/Inventory System Subject to Random Disruptions
- Planning stability in a product recovery system
- A production model for deteriorating inventory items with production disruptions
- Production planning in a three-stock reverse-logistics system with deteriorating items under a continuous review policy
Approximation methods and heuristics in mathematical programming (90C59) Applications of mathematical programming (90C90) Inventory, storage, reservoirs (90B05) Production models (90B30)
Cites Work
- An EPQ model with inflation in an imperfect production system
- Optimal batch sizing in a multi-stage production system with rework consideration
- Multi-stage production-inventory systems
- Robust planning in optimization for production system subject to random machine breakdown and failure in rework
- An economic production quantity model with flexibility and reliability considerations
- The effect of capital lockup and customer trade credits on the optimal lot size -- a confirmation of the EPQ.
- A dynamic analysis of the single-item periodic stochastic inventory system with order capacity
- Supply interruptions in a lost-sales inventory system with random lead time
- A disruption recovery model for a single stage production-inventory system
- Development of a production inventory model with uncertainty and reliability considerations
- On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time
- Real time disruption management for a two-stage batch production-inventory system with reliability considerations
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
- Title not available (Why is that?)
- Determination of Optimum Production Quantity for a Two-Stage Production System
- Analysis of a Production/Inventory System Subject to Random Disruptions
- Disruption management in production planning
- Recovering Cyclic Schedules Using Dynamic Produce-Up-To Policies
- Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time
- A dynamic programming approach for batch sizing in a multi-stage production process with random yields
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
Cited In (8)
- Managing sudden transportation disruptions in supply chains under delivery delay and quantity loss
- Mitigating partial-disruption risk: a joint facility location and inventory model considering customers' preferences and the role of substitute products and backorder offers
- Impact of reorder option in supply chain coordination
- Managing risk and disruption in production-inventory and supply chain systems: a review
- Disruption management in production planning
- A quantitative model for disruption mitigation in a supply chain
- Strategies for ensuring required service level for COVID-19 herd immunity in Indian vaccine supply chain
- An inventory model for a three-stage supply chain with random capacities considering disruptions and supplier reliability
This page was built for publication: A disruption recovery plan in a three-stage production-inventory system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q337485)