Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
From MaRDI portal
Publication:3720281
DOI10.1287/mnsc.32.1.113zbMath0591.90042OpenAlexW2088073427MaRDI QIDQ3720281
Publication date: 1986
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.32.1.113
heuristic proceduremulti-stage manufacturing systemscomponent lot- splitting policymulti-stage lot-sizing
Related Items (14)
Abstimmung von Produktions- und Transportlosgrößen zwischen Zulieferer und Produzent. Eine Analyse auf der Grundlage stationärer Losgrößenmodelle ⋮ Lot streaming in three-stage production processes ⋮ A disruption recovery plan in a three-stage production-inventory system ⋮ Approximation methods for discrete lot streaming in flow shops ⋮ The impact of OPT and TPM on the economic production quantity ⋮ A genetic algorithm for solving the economic lot scheduling problem in flow shops ⋮ Multi-stage production-inventory systems ⋮ An \((s,Q)\) policy with setup reduction in a single-stage batch manufacturing system ⋮ The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. ⋮ Effects of WIP inventories on integrated production lot sizing in cellular manufacturing ⋮ Impact of family-based scheduling on transfer batches in a job shop manufacturing cell ⋮ The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic ⋮ Optimal production cycles, procurement schedules, and joint investment in an imperfect production system ⋮ Lot streaming with detached setups in three-machine flow shops
This page was built for publication: Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems