The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops.
From MaRDI portal
Publication:5928378
DOI10.1016/S0377-2217(99)00466-XzbMath1125.90355MaRDI QIDQ5928378
Jamal Quenniche, Fayez F. Boctor
Publication date: 28 March 2001
Published in: European Journal of Operational Research (Search for Journal in Brave)
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
90C27: Combinatorial optimization
Related Items
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case, A heuristic approach for determining lot sizes and schedules using power-of-two policy, Heuristics for theN-product,M-stage, economic lot sizing and scheduling problem with dynamic demand, A genetic algorithm for solving the economic lot scheduling problem in flow shops
Cites Work
- Unnamed Item
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
- Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”
- Note—On the Optimality of Sub-Batch Sizes for a Multi-Stage EPQ Model—A Rejoinder
- Multi-cyclic flow shop scheduling: An application in multi-stage, multiproduct production processes
- Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production
- Economic Lot Size Determination in Multi-Stage Assembly Systems