Multi-cyclic flow shop scheduling: An application in multi-stage, multiproduct production processes
From MaRDI portal
Publication:4245378
DOI10.1080/002075497194093zbMATH Open0946.90521OpenAlexW2072586631MaRDI QIDQ4245378FDOQ4245378
Authors: M. K. El-Najdawi
Publication date: 5 October 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194093
Recommendations
Cited In (12)
- Title not available (Why is that?)
- Title not available (Why is that?)
- A genetic algorithm for solving the economic lot scheduling problem in flow shops
- The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops.
- Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines
- Cyclic Scheduling of Multimodal Concurrently Flowing Processes
- Max-plus-based mathematical formulation for cyclic permutation flow-shops
- The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic
- Rotation cycle schedulings for multi-item production systems.
- A heuristic approach for determining lot sizes and schedules using power-of-two policy
- Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production
- The cycle time distribution
This page was built for publication: Multi-cyclic flow shop scheduling: An application in multi-stage, multiproduct production processes
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245378)