scientific article; zbMATH DE number 1808549
From MaRDI portal
Publication:3149922
Recommendations
- Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes
- Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs
- Multi-cyclic flow shop scheduling: An application in multi-stage, multiproduct production processes
- Sequencing, lot sizing and scheduling of several products in job shops: The common cycle approach
Cited in
(5)- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes
- Multi-cyclic flow shop scheduling: An application in multi-stage, multiproduct production processes
- Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production
- Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case
- Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3149922)