Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production
From MaRDI portal
Publication:4276605
DOI10.1287/mnsc.39.7.872zbMath0785.90042OpenAlexW2024462734MaRDI QIDQ4276605
M. K. El-Najdawi, Paul R. Kleindorfer
Publication date: 13 April 1994
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.39.7.872
production planningjob-shop schedulinginventory managementlot-size schedulingcommon cycle schedulingmulti-stage, multi-product, flow- shop environment
Related Items
A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes ⋮ Cyclic scheduling to minimize inventory in a batch flow line ⋮ The inventory replenishment planning and staggering problem: a bi-objective approach ⋮ Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case ⋮ Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines ⋮ An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors ⋮ A genetic algorithm for solving the economic lot scheduling problem in flow shops ⋮ Reformulation, linearization, and a hybrid iterated local search algorithm for economic lot-sizing and sequencing in hybrid flow shop problems ⋮ The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. ⋮ The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic ⋮ A computational comparison of cyclical and non-cyclical control for stochastic production-inventory systems ⋮ Heuristics for theN-product,M-stage, economic lot sizing and scheduling problem with dynamic demand ⋮ Competitive methods for multi-level lot sizing and scheduling: tabu search and randomized regrets