Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
From MaRDI portal
Publication:4073091
DOI10.1287/MNSC.22.3.298zbMATH Open0313.90017OpenAlexW2115429835MaRDI QIDQ4073091FDOQ4073091
Authors: Andrew Z. Szendrovits
Publication date: 1975
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.22.3.298
Cited In (37)
- Learning effects and the phenomenon of moving bottlenecks in a two-stage production system
- Discontinuous optimization in a class of multi-stage production systems
- A bargaining model with asymmetric information for a single supplier-single buyer problem
- Lot streaming in three-stage production processes
- Lot streaming with detached setups in three-machine flow shops
- A genetic algorithm for solving the economic lot scheduling problem in flow shops
- Production scheduling and sequencing for multi-stage production systems
- The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops.
- Optimizing multi-stage production for an assembly-type supply chain with unequal sized batch shipments
- Behaviour of a production system for varying marketing decisions
- Effect of machine failures in a multi-stage multi-facility and multi-product production-inventory system
- Optimal mixed batch shipment policy with variable safety factor for the single-vendor single-buyer production-inventory system
- An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors
- Multi-stage production-inventory systems
- Lot streaming models with a limited number of capacitated transporters in multistage batch production systems
- An optimal mixed batch shipment policy for multiple items in a single-supplier multiple-retailer integrated system
- A unified EPQ model for packaging two items jointly manufactured through several stages
- The impact of OPT and TPM on the economic production quantity
- Optimizing a production system with rework and equal sized batch shipments
- Optimizing a multi-stage production/inventory system by DC programming based approaches
- Optimal lot streaming for multiple products in a two-machine flow shop
- Approximation methods for discrete lot streaming in flow shops
- Flow shop scheduling with lot streaming
- A model for determining job throughput times for manufacturing flow line workcells with finite buffers
- Optimal investment and lot-sizing policies for improved productivity and quality
- Expected time in system analysis of a single-machine multi-item processing center.
- Optimal inventory policies for serial-type and assembly-type supply chains with equal sized batch
- The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic
- Multi-stage production with variable lot sizes and transportation of partial lots
- A heuristic approach for determining lot sizes and schedules using power-of-two policy
- Lot-sizing in a class of multistage production inventory systems
- Single supplier single retailer inventory model controlled by the reorder and shipping points with sharing information
- Batch sizing with controllable production rates
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes
- Cyclic scheduling to minimize inventory in a batch flow line
- On the equivalence of small batch assembly line balancing and lot streaming in a flow shop
- Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
This page was built for publication: Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4073091)