Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
From MaRDI portal
Publication:4073091
DOI10.1287/mnsc.22.3.298zbMath0313.90017OpenAlexW2115429835MaRDI QIDQ4073091
Publication date: 1975
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.22.3.298
Related Items (37)
A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes ⋮ Lot streaming in three-stage production processes ⋮ Cyclic scheduling to minimize inventory in a batch flow line ⋮ Lot streaming models with a limited number of capacitated transporters in multistage batch production systems ⋮ Batch sizing with controllable production rates ⋮ Optimizing a production system with rework and equal sized batch shipments ⋮ Discontinuous optimization in a class of multi-stage production systems ⋮ Approximation methods for discrete lot streaming in flow shops ⋮ Optimal lot streaming for multiple products in a two-machine flow shop ⋮ Behaviour of a production system for varying marketing decisions ⋮ Lot-sizing in a class of multistage production inventory systems ⋮ Effect of machine failures in a multi-stage multi-facility and multi-product production-inventory system ⋮ The impact of OPT and TPM on the economic production quantity ⋮ Production scheduling and sequencing for multi-stage production systems ⋮ An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors ⋮ A unified EPQ model for packaging two items jointly manufactured through several stages ⋮ Optimizing multi-stage production for an assembly-type supply chain with unequal sized batch shipments ⋮ A genetic algorithm for solving the economic lot scheduling problem in flow shops ⋮ Multi-stage production-inventory systems ⋮ Optimizing a multi-stage production/inventory system by DC programming based approaches ⋮ Expected time in system analysis of a single-machine multi-item processing center. ⋮ A heuristic approach for determining lot sizes and schedules using power-of-two policy ⋮ Optimal mixed batch shipment policy with variable safety factor for the single-vendor single-buyer production-inventory system ⋮ An optimal mixed batch shipment policy for multiple items in a single-supplier multiple-retailer integrated system ⋮ The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. ⋮ Optimal investment and lot-sizing policies for improved productivity and quality ⋮ The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic ⋮ A model for determining job throughput times for manufacturing flow line workcells with finite buffers ⋮ Learning effects and the phenomenon of moving bottlenecks in a two-stage production system ⋮ Optimal inventory policies for serial-type and assembly-type supply chains with equal sized batch ⋮ Lot streaming with detached setups in three-machine flow shops ⋮ Flow shop scheduling with lot streaming ⋮ Single supplier single retailer inventory model controlled by the reorder and shipping points with sharing information ⋮ Multi-stage production with variable lot sizes and transportation of partial lots ⋮ On the equivalence of small batch assembly line balancing and lot streaming in a flow shop ⋮ Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling ⋮ A bargaining model with asymmetric information for a single supplier-single buyer problem
This page was built for publication: Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model