Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model

From MaRDI portal
Publication:4073091

DOI10.1287/mnsc.22.3.298zbMath0313.90017OpenAlexW2115429835MaRDI QIDQ4073091

Andrew Z. Szendrovits

Publication date: 1975

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.22.3.298




Related Items (37)

A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processesLot streaming in three-stage production processesCyclic scheduling to minimize inventory in a batch flow lineLot streaming models with a limited number of capacitated transporters in multistage batch production systemsBatch sizing with controllable production ratesOptimizing a production system with rework and equal sized batch shipmentsDiscontinuous optimization in a class of multi-stage production systemsApproximation methods for discrete lot streaming in flow shopsOptimal lot streaming for multiple products in a two-machine flow shopBehaviour of a production system for varying marketing decisionsLot-sizing in a class of multistage production inventory systemsEffect of machine failures in a multi-stage multi-facility and multi-product production-inventory systemThe impact of OPT and TPM on the economic production quantityProduction scheduling and sequencing for multi-stage production systemsAn optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factorsA unified EPQ model for packaging two items jointly manufactured through several stagesOptimizing multi-stage production for an assembly-type supply chain with unequal sized batch shipmentsA genetic algorithm for solving the economic lot scheduling problem in flow shopsMulti-stage production-inventory systemsOptimizing a multi-stage production/inventory system by DC programming based approachesExpected time in system analysis of a single-machine multi-item processing center.A heuristic approach for determining lot sizes and schedules using power-of-two policyOptimal mixed batch shipment policy with variable safety factor for the single-vendor single-buyer production-inventory systemAn optimal mixed batch shipment policy for multiple items in a single-supplier multiple-retailer integrated systemThe two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops.Optimal investment and lot-sizing policies for improved productivity and qualityThe multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristicA model for determining job throughput times for manufacturing flow line workcells with finite buffersLearning effects and the phenomenon of moving bottlenecks in a two-stage production systemOptimal inventory policies for serial-type and assembly-type supply chains with equal sized batchLot streaming with detached setups in three-machine flow shopsFlow shop scheduling with lot streamingSingle supplier single retailer inventory model controlled by the reorder and shipping points with sharing informationMulti-stage production with variable lot sizes and transportation of partial lotsOn the equivalence of small batch assembly line balancing and lot streaming in a flow shopMinimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop schedulingA bargaining model with asymmetric information for a single supplier-single buyer problem




This page was built for publication: Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model