Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
From MaRDI portal
Publication:1603328
DOI10.1016/S0305-0548(01)00032-6zbMath0994.90063MaRDI QIDQ1603328
Publication date: 11 July 2002
Published in: Computers \& Operations Research (Search for Journal in Brave)
90B35: Deterministic scheduling theory in operations research
Related Items
A discrete particle swarm optimization for lot-streaming flowshop scheduling problem, Queueing network analysis on dynamic lot streaming, Two-machine flow shop scheduling with two criteria: maximum earliness and makespan, Earliness--tardiness production planning for just-in-time manufacturing: a unifying approach by goal programming
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Optimal lot streaming for multiple products in a two-machine flow shop
- Lot streaming with detached setups in three-machine flow shops
- Lot streaming in three-stage production processes
- Generalized pairwise interchanges and machine scheduling
- Flow shop scheduling with lot streaming
- A comparison of local search methods for flow shop scheduling
- Structural Properties of Lot Streaming in a Flow Shop
- Sequencing with Earliness and Tardiness Penalties: A Review
- Two- and three-machine flow shop scheduling problems with equal sized transfer batches
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
- Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Basic Techniques for Lot Streaming
- Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems