Structural Properties of Lot Streaming in a Flow Shop
From MaRDI portal
Publication:2757554
DOI10.1287/moor.23.3.624zbMath0977.90013OpenAlexW2024979665MaRDI QIDQ2757554
Chris N. Potts, Celia A. Dr. Glass
Publication date: 26 November 2001
Published in: Mathematics of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/moor.23.3.624
Related Items
Lot streaming models with a limited number of capacitated transporters in multistage batch production systems ⋮ Lot streaming multiple jobs in a flow shop ⋮ Single-job lot streaming in \(m - 1\) two-stage hybrid flowshops ⋮ Dynamic programming algorithms and Lagrangian lower bounds for a discrete lot streaming problem in a two-machine flow shop ⋮ Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process ⋮ An integrated tabu search algorithm for the lot streaming problem in job shops ⋮ On the equivalence of small batch assembly line balancing and lot streaming in a flow shop ⋮ Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling