Delayed payment policy in multi-product single-machine economic production quantity model with repair failure and partial backordering
From MaRDI portal
Publication:2190267
Recommendations
- The simplifi ed solution procedure for a replenishment policy with defective products, backlog and delay of payments
- A replenishment policy with defective products, backlog and delay of payments
- Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint
- An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production
- The EOQ model with defective items and partially permissible delay in payments linked to order quantity derived analytically in the supply chain management
Cites work
- A comprehensive extension of the optimal replenishment decisions under two levels of trade credit policy depending on the order quantity
- A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space
- A simple method to compute economic order quantities: some observations
- An economic order quantity model for deteriorating item in a purchasing system with multiple prepayments
- An EOQ model with delay in payments and time varying deterioration rate
- An EPQ model with inflation in an imperfect production system
- An integrated inventory model with variable lead time, defective units and delay in payments
- An inventory model with reliability in an imperfect production process
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework
- Economic order quantity model for deteriorating items with planned backorder level
- Economic production quantity model with repair failure and limited capacity
- scientific article; zbMATH DE number 2064349 (Why is no real title available?)
- Inventory models with back-order discounts and variable lead time
- Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time
- Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy
- Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy
- Partial trade-credit policy of retailer with exponentially deteriorating items
- Production lot size problem with failure in repair and backlogging derived without derivatives
- Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products
- Supply chain model with stochastic lead time, trade-credit financing, and transportation discounts
- Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction
Cited in
(3)- Sustainable supply chain model for multi-stage manufacturing with partial backlogging under the fuzzy environment with the effect of learning in screening process
- The simplifi ed solution procedure for a replenishment policy with defective products, backlog and delay of payments
- An EPQ model for a single-machine multiproduct imperfect production system using a hybrid logarithmic barrier method
This page was built for publication: Delayed payment policy in multi-product single-machine economic production quantity model with repair failure and partial backordering
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2190267)