A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
From MaRDI portal
Publication:1037696
DOI10.1016/J.EJOR.2009.03.014zbMath1175.90016OpenAlexW2039704104MaRDI QIDQ1037696
Yuan-Shyi Peter Chiu, Chia-Kuan Ting
Publication date: 16 November 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2009.03.014
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (3)
A production inventory supply chain model with partial backordering and disruption under triangular linguistic dense fuzzy lock set approach ⋮ An EPQ model with inflation in an imperfect production system ⋮ Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework
Cites Work
This page was built for publication: A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns