Cross-facility management of production and transportation planning problem (Q2499157): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claim: author (P16): Item:Q1011267
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / author
 
Property / author: Sandra Duni Ekşioğlu / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2005.02.038 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1994404409 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production/distribution planning in supply chains: An invited review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The complexity of the network design problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of a flow problem with fixed charges / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3042874 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Manufacturing Planning Over Alternative Facilities: Modeling, Analysis and Algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Coordination of production and distribution planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Branch-and-Price Algorithm for the Multiperiod Single-Sourcing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A probabilistic analysis of the multi-period single-sourcing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Version of the Economic Lot Size Model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimum Concave Cost Flows in Certain Networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3351135 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Dual-Based Procedure for Uncapacitated Facility Location / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new dynamic programming algorithm for the single item capacitated dynamic lot size model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5314962 / rank
 
Normal rank

Latest revision as of 18:56, 24 June 2024

scientific article
Language Label Description Also known as
English
Cross-facility management of production and transportation planning problem
scientific article

    Statements

    Cross-facility management of production and transportation planning problem (English)
    0 references
    0 references
    0 references
    0 references
    14 August 2006
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    supply chains
    0 references
    production planning problem
    0 references
    transportation planning problem
    0 references
    fixed-charge network flow problem
    0 references
    heuristic approach
    0 references
    0 references