Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system (Q856147): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(6 intermediate revisions by 5 users not shown)
Property / author
 
Property / author: Alireza Rahimi-Vahed / rank
Normal rank
 
Property / author
 
Property / author: Alireza Rahimi-Vahed / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: Genocop / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.amc.2006.02.033 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1995386558 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note—Sequencing JIT Mixed-Model Assembly Lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: An analytic framework for sequencing mixed model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing mixed-model assembly lines to level parts usage and minimize line length / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic Algorithms: Foundations and Applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4692508 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4873721 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 11:17, 25 June 2024

scientific article
Language Label Description Also known as
English
Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
scientific article

    Statements

    Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system (English)
    0 references
    7 December 2006
    0 references
    0 references
    multi-criteria sequencing
    0 references
    mixed-model assembly line
    0 references
    JIT system
    0 references
    memetic algorithm
    0 references
    0 references