Considering scheduling and preventive maintenance in the flowshop sequencing problem (Q883296): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 4 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: SPLIDA / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2005.12.007 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2033437970 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production and maintenance integrated planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: Maintenance Policies for Stochastically Failing Equipment: A Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of maintenance models: The control and surveillance of deteriorating systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3824084 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4211180 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4443625 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4442937 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3332127 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimum Preventive Maintenance Policies / rank
 
Normal rank
Property / cites work
 
Property / cites work: A repair replacement model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal strategies for some repair replacement models / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525911 / rank
 
Normal rank
Property / cites work
 
Property / cites work: On general routing problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Evaluation of Flow Shop Sequencing Heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A comprehensive review and evaluation of permutation flowshop heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the makespan for the flow shop scheduling problem with availability constraints. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A contribution to the stochastic flow shop scheduling problem. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with maintenance and repair rate-modifying activities / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new heuristic method for the flow shop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fast tabu search algorithm for the permutation flow-shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 20:32, 25 June 2024

scientific article
Language Label Description Also known as
English
Considering scheduling and preventive maintenance in the flowshop sequencing problem
scientific article

    Statements

    Considering scheduling and preventive maintenance in the flowshop sequencing problem (English)
    0 references
    0 references
    0 references
    4 June 2007
    0 references
    0 references
    flowshop
    0 references
    sequencing
    0 references
    preventive maintenance
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references