A Two-Stage Flexible Flowshop Problem with Deterioration (Q3511377): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/978-3-540-69733-6_64 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1576703073 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batching and Scheduling Jobs on Batch and Discrete Processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: A concise survey of scheduling with time-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525910 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed / rank
 
Normal rank

Latest revision as of 13:13, 28 June 2024

scientific article
Language Label Description Also known as
English
A Two-Stage Flexible Flowshop Problem with Deterioration
scientific article

    Statements