Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach (Q3527930): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540500536939 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2076028784 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Beam-ACO--hybridizing ant colony optimization with beam search: an application to open shop scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A computational study of heuristics for two-stage flexible flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Stage, Hybrid Flowshop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a two-stage hybrid flow shop with parallel machines at the first stage / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid flow-shop scheduling problems with multiprocessor task systems. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Branch and bound crossed with GA to solve hybrid flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-stage parallel-processor flowshop problem with minimum flowtime / rank
 
Normal rank
Property / cites work
 
Property / cites work: Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiprocessor task scheduling in multistage hybrid flow-shops: a genetic algorithm approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: An ant colony system for permutation flow-shop sequencing / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 16:53, 28 June 2024

scientific article
Language Label Description Also known as
English
Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach
scientific article

    Statements

    Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach (English)
    0 references
    0 references
    0 references
    1 October 2008
    0 references
    scheduling
    0 references
    hybrid flow-shop
    0 references
    multiprocessor task
    0 references
    ant colony optimization
    0 references

    Identifiers