Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm (Q955949): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q57185818 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2045430093 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing and scheduling in robotic cells: recent developments / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the fleet size with dependent time-window and single-track constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling no-wait robotic cells with two and three machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved algorithm for cyclic flowshop scheduling in a robotic cell / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimal quantity of operators for serving a homogeneous linear technological process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the number of robots to meet a given cyclic schedule / rank
 
Normal rank
Property / cites work
 
Property / cites work: Cyclic scheduling in a robotic production line / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem / rank
 
Normal rank

Latest revision as of 21:01, 28 June 2024

scientific article
Language Label Description Also known as
English
Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm
scientific article

    Statements

    Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm (English)
    0 references
    0 references
    0 references
    24 November 2008
    0 references
    Summary: Modern automated production lines usually use one or multiple computer-controlled robots or hoists for material handling between workstations. A typical application of such lines is an automated electroplating line for processing printed circuit boards (PCBs). In these systems, cyclic production policy is widely used due to large lot size and simplicity of implementation. This paper addresses cyclic scheduling of a multihoist electroplating line with constant processing times. The objective is to minimize the cycle time, or equivalently to maximize the production throughput, for a given number of hoists. We propose a mathematical model and a polynomial algorithm for this scheduling problem. Computational results on randomly generated instances are reported.
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references