On-line two-machine open shop scheduling with time lags (Q2654315): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2009.09.023 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W4250059264 / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line scheduling of small open shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line scheduling of two-machine open shops where jobs arrive over time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tactically delayed versus non-delay scheduling: An experimental investigation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fault-tolerant scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Open shop scheduling with delays / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine open shop scheduling with special transportation times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for the two-machine open-shop scheduling problem with transportation times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4884350 / rank
 
Normal rank

Latest revision as of 09:48, 2 July 2024

scientific article
Language Label Description Also known as
English
On-line two-machine open shop scheduling with time lags
scientific article

    Statements