Tactically delayed versus non-delay scheduling: An experimental investigation (Q1068706)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 3932775
Language Label Description Also known as
default for all languages
No label defined
    English
    Tactically delayed versus non-delay scheduling: An experimental investigation
    scientific article; zbMATH DE number 3932775

      Statements

      Tactically delayed versus non-delay scheduling: An experimental investigation (English)
      0 references
      0 references
      1986
      0 references
      This paper compares tactically delayed scheduling to non-delay scheduling. While both of these types of schedules belong to the class of active schedules, tactically delayed schedules have the feature of introducing deliberate idle periods into the schedule. Non-delay schedules permit no such delays. To compare these scheduling methods, a number of sample single-machine problems are analyzed. For each problem, all possible non-delay and tactically delayed schedules are enumerated and the resulting tardiness of each schedule is recorded. Non-delay schedules are found to be considerably less numerous with lower total tardiness on average. Tactically delayed schedules appear to have better best case behavior than non-delay schedules. The results here allure further research into active scheduling methods.
      0 references
      tactically delayed scheduling
      0 references
      single-machine problems
      0 references
      0 references

      Identifiers