Integrated production and delivery scheduling with disjoint windows (Q972326): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.dam.2009.12.010 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2063361697 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batch scheduling of step deteriorating jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximating the Throughput of Multiple Machines in Real-Time Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3374091 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bin packing: Maximizing the number of pieces packed / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production/distribution planning in supply chains: An invited review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4783488 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and design of global logistics systems: a review of integrated strategic and tactical models and design algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improving the complexities of approximation algorithms for optimization problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on an open-end bin packing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Coordinated supply chain management / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Ordered Open-End Bin-Packing Problem / rank
 
Normal rank

Latest revision as of 21:16, 2 July 2024

scientific article
Language Label Description Also known as
English
Integrated production and delivery scheduling with disjoint windows
scientific article

    Statements

    Integrated production and delivery scheduling with disjoint windows (English)
    0 references
    0 references
    0 references
    0 references
    25 May 2010
    0 references
    0 references
    perishable goods
    0 references
    single machine
    0 references
    parallel and identical machines
    0 references
    NP-hard and strongly NP-hard
    0 references
    fully polynomial time approximation schemes
    0 references
    0 references