The examination timetabling problem at Universiti Malaysia Pahang: comparison of a constructive heuristic with an existing software solution (Q992647): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Q2779807 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Recent research directions in automated timetabling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A graph-based hyper-heuristic for educational timetabling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: An introduction to timetabling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q2779804 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved multi-staged algorithmic process for~the~solution of the examination timetabling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Setting the Research Agenda in Automated Timetabling: The Second International Timetabling Competition / rank
 
Normal rank
Property / cites work
 
Property / cites work: A study of heuristic combinations for hyper-heuristic systems for the uncapacitated examination timetabling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of search methodologies and automated system development for examination timetabling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Timetabling problems at the TU Eindhoven / rank
 
Normal rank

Latest revision as of 04:48, 3 July 2024

scientific article
Language Label Description Also known as
English
The examination timetabling problem at Universiti Malaysia Pahang: comparison of a constructive heuristic with an existing software solution
scientific article

    Statements

    The examination timetabling problem at Universiti Malaysia Pahang: comparison of a constructive heuristic with an existing software solution (English)
    0 references
    0 references
    0 references
    9 September 2010
    0 references
    0 references
    optimisation
    0 references
    timetabling
    0 references
    heuristic
    0 references
    scheduling
    0 references
    0 references