Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic (Q3055403): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540701871085 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1976237921 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A computational study of heuristics for two-stage flexible flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a two-stage hybrid flow shop with parallel machines at the first stage / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid flow-shop scheduling problems with multiprocessor task systems. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-stage parallel-processor flowshop problem with minimum flowtime / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4424549 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiprocessor task scheduling in multistage hybrid flow-shops: a genetic algorithm approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach / rank
 
Normal rank

Latest revision as of 11:15, 3 July 2024

scientific article
Language Label Description Also known as
English
Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic
scientific article

    Statements

    Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic (English)
    0 references
    0 references
    0 references
    7 November 2010
    0 references
    0 references
    scheduling
    0 references
    hybrid flowshop
    0 references
    heuristic
    0 references
    0 references