Single machine scheduling problems with financial resource constraints: some complexity results and properties (Q554491): Difference between revisions

From MaRDI portal
Created claim: Wikidata QID (P12): Q57633864, #quickstatements; #temporary_batch_1707161894653
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.mathsocsci.2011.04.004 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2108940302 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling subject to nonrenewable-resource constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Total Tardiness on One Machine is NP-Hard / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3741388 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4124332 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A special case of the single-machine total tardiness problem is NP-hard / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for special cases of the single machine total tardiness problem and an application to the even-odd partition problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4055377 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A decomposition algorithm for the single machine total tardiness problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Preemptive scheduling of independent jobs on parallel machines subject to financial constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solution of the single machine total tardiness problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling under a Non-renewable Resource Constraint / rank
 
Normal rank

Latest revision as of 09:35, 4 July 2024

scientific article
Language Label Description Also known as
English
Single machine scheduling problems with financial resource constraints: some complexity results and properties
scientific article

    Statements

    Single machine scheduling problems with financial resource constraints: some complexity results and properties (English)
    0 references
    0 references
    0 references
    0 references
    4 August 2011
    0 references
    In this paper single-machine scheduling problems with a non-renewable resource are studied. Given is a set of jobs \(j=1,\ldots,n\) with processing times \(p_j\) which have to be processed on a single machine. Furthermore, a non-renewable resource is given, which becomes available at specified points in time and is consumed by the jobs. The goal is to find a feasible schedule respecting the resource constraints and minimizing a given objective function. It is shown that the problem is strongly NP-hard for the makespan objective, minimizing the total tardiness (even if all due dates are the same) and that it is NP-hard for the total completion time. Afterwards, structural properties for special cases of the tardiness problem are studied. Finally, the so-called budget problem minimizing the makespan is considered.
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    scheduling
    0 references
    non-renewable resource
    0 references
    complexity
    0 references
    0 references
    0 references