Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs (Q440780): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.amc.2012.02.033 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2009304557 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Deteriorating Jobs on a Single Processor / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with time dependent processing times: Review and extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A concise survey of scheduling with time-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total completion time in a two-machine flow shop with deteriorating jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: An FPTAS for scheduling jobs with piecewise linear decreasing processing times to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates / rank
 
Normal rank
Property / cites work
 
Property / cites work: An FPTAS for parallel-machine scheduling under a grade of service provision to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling problems with both deteriorating jobs and learning effects / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling problems with both start-time dependent learning and position dependent aging effects under deteriorating maintenance consideration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine group scheduling problems with deteriorated and learning effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on optimization in deteriorating systems using scheduling problems with the aging effect and resource allocation models / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some single-machine scheduling problems with general effects of learning and deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with nonlinear deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Groups of Jobs on a Single Machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine group scheduling problems with deterioration consideration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine quadratic penalty function scheduling with deteriorating jobs and group technology / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4142699 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3938812 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A dual algorithm for the one-machine scheduling problem / rank
 
Normal rank

Latest revision as of 14:29, 5 July 2024

scientific article
Language Label Description Also known as
English
Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs
scientific article

    Statements

    Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs (English)
    0 references
    0 references
    0 references
    19 August 2012
    0 references
    0 references
    group technology
    0 references
    total weighted number of late jobs
    0 references
    deteriorating jobs
    0 references
    0 references
    0 references
    0 references