Minimizing total completion time in a two-machine flow shop with deteriorating jobs (Q850246)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 5072704
Language Label Description Also known as
default for all languages
No label defined
    English
    Minimizing total completion time in a two-machine flow shop with deteriorating jobs
    scientific article; zbMATH DE number 5072704

      Statements

      Minimizing total completion time in a two-machine flow shop with deteriorating jobs (English)
      0 references
      0 references
      0 references
      0 references
      0 references
      15 November 2006
      0 references
      In the paper two-machine flow-shop scheduling problems with deteriorating jobs are studied where the processing time of a job is given by an increasing linear deterioration function depending on its starting time. The objective is to find a schedule minimizing the total completion time. At first, the authors study some polynomially solvable special cases of the problem and derive some dominance properties and two lower bounds. Afterwards, a heuristic and a branch-and-bound algorithm are proposed and compared in computational experiments.
      0 references
      0 references
      scheduling
      0 references
      flow-shop
      0 references
      simple linear deterioration
      0 references
      total completion time
      0 references
      0 references