Pages that link to "Item:Q850246"
From MaRDI portal
The following pages link to Minimizing total completion time in a two-machine flow shop with deteriorating jobs (Q850246):
Displaying 30 items.
- A high performing metaheuristic for multi-objective flowshop scheduling problem (Q337199) (← links)
- Permutation flow shop scheduling with order acceptance and weighted tardiness (Q419558) (← links)
- Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs (Q440780) (← links)
- A single-machine scheduling with a truncated linear deterioration and ready times (Q497952) (← links)
- Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration (Q621032) (← links)
- Single-machine scheduling with linear decreasing deterioration to minimize earliness penalties (Q638880) (← links)
- Joint reply to the erratum and the note on ``Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning'' (Q646155) (← links)
- Some single-machine and flowshop scheduling problems with a non-linear deterioration function (Q660909) (← links)
- Non-permutation flow shop scheduling with order acceptance and weighted tardiness (Q670790) (← links)
- Single-machine scheduling with nonlinear deterioration (Q691413) (← links)
- A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem (Q730912) (← links)
- A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs (Q733523) (← links)
- A multi-objective particle swarm for a flow shop scheduling problem (Q867030) (← links)
- Scheduling linear deteriorating jobs with rejection on a single machine (Q953419) (← links)
- A note on single-machine scheduling with decreasing time-dependent job processing times (Q967802) (← links)
- Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates (Q1001006) (← links)
- Single machine parallel-batch scheduling with deteriorating jobs (Q1006057) (← links)
- Parallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deterioration (Q1010295) (← links)
- Single-machine scheduling with logarithm deterioration (Q1926617) (← links)
- Two-machine flow shop total tardiness scheduling problem with deteriorating jobs (Q1930748) (← links)
- Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop (Q2241320) (← links)
- No-wait flow shop scheduling using fuzzy multi-objective linear programming (Q2271524) (← links)
- Scheduling two agents with sum-of-processing-times-based deterioration on a single machine (Q2453274) (← links)
- Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs (Q2514766) (← links)
- Minimizing Makespan in Permutation Flow Shop Scheduling with Proportional Deterioration (Q2788531) (← links)
- Permutation Flow Shop Problem with Shortening Job Processing Times (Q2821099) (← links)
- MAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS (Q2873830) (← links)
- SINGLE-MACHINE SCHEDULING WITH PROPORTIONALLY DETERIORATING JOBS SUBJECT TO AVAILABILITY CONSTRAINTS (Q2920364) (← links)
- A SINGLE-MACHINE DETERIORATING JOB SCHEDULING PROBLEM WITH A NON-REGULAR CRITERION (Q3013563) (← links)
- Permutation flowshop scheduling with simple linear deterioration (Q5059195) (← links)