Modeling and solving rich quay crane scheduling problems (Q1761126): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2011.09.025 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1968811477 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Container terminal operation and operations research -- a classification and literature review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Operations research at container terminals: a literature update / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of berth allocation and quay crane scheduling problems in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling with spatial constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling with non-crossing constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: A <i>m</i>‐parallel crane scheduling problem with a non‐crossing constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: The quay crane scheduling problem with time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulation-based optimization for discharge/loading operations at a maritime container terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: A crane scheduling method for port container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search heuristic for the quay crane scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fast heuristic for quay crane scheduling with interference constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Exact and approximation algorithms for makespan minimization on unrelated parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Duality-Based Algorithms for Scheduling Unrelated Parallel Machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q2740516 / rank
 
Normal rank

Latest revision as of 20:45, 5 July 2024

scientific article
Language Label Description Also known as
English
Modeling and solving rich quay crane scheduling problems
scientific article

    Statements

    Modeling and solving rich quay crane scheduling problems (English)
    0 references
    0 references
    0 references
    0 references
    15 November 2012
    0 references
    container terminal
    0 references
    quay crane scheduling
    0 references
    timed Petri net
    0 references

    Identifiers