A modified PSO algorithm for minimizing the total costs of resources in MRCPSP (Q1954712): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(7 intermediate revisions by 5 users not shown)
Property / author
 
Property / author: Mohammad R. Ranjbar / rank
Normal rank
 
Property / author
 
Property / author: Mohammad R. Ranjbar / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q58911491 / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: PSPLIB / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: Tabu search / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1155/2012/365697 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2046947164 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling. A research handbook. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling subject to resource constraints: Classification and complexity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: Notation, classification, models, and methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4667334 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving zero-one mixed integer programming problems using tabu search / rank
 
Normal rank
Property / cites work
 
Property / cites work: An exact algorithm for project scheduling with multiple modes / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of variants and extensions of the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: PSPLIB -- a project scheduling problem library / rank
 
Normal rank
Property / cites work
 
Property / cites work: Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems / rank
 
Normal rank

Latest revision as of 12:53, 6 July 2024

scientific article
Language Label Description Also known as
English
A modified PSO algorithm for minimizing the total costs of resources in MRCPSP
scientific article

    Statements

    A modified PSO algorithm for minimizing the total costs of resources in MRCPSP (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    11 June 2013
    0 references
    Summary: We introduce a multimode resource-constrained project scheduling problem with finish-to-start precedence relations among project activities, considering renewable and nonrenewable resource costs. We assume that renewable resources are rented and are not available in all periods of time of the project. In other words, there is a mandated ready date as well as a due date for each renewable resource type so that no resource is used before its ready date. However, the resources are permitted to be used after their due dates by paying penalty costs. The objective is to minimize the total costs of both renewable and nonrenewable resource usage. This problem is called multimode resource-constrained project scheduling problem with minimization of total weighted resource tardiness penalty cost (MRCPSP-TWRTPC), where, for each activity, both renewable and nonrenewable resource requirements depend on activity mode. For this problem, we present a metaheuristic algorithm based on a modified Particle Swarm Optimization (PSO) approach introduced by Tchomté and Gourgand which uses a modified rule for the displacement of particles. We present a prioritization rule for activities and several improvement and local search methods. Experimental results reveal the effectiveness and efficiency of the proposed algorithm for the problem in question.
    0 references
    0 references
    0 references
    0 references
    0 references
    multimode resource-constrained project scheduling problem