A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (Q1955186): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 4 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1155/2012/786923 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2047163713 / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q58911921 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4472058 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: A survey of recent developments. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: Notation, classification, models, and methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: Experimental investigation of heuristics for resource-constrained project scheduling: an update / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of variants and extensions of the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling under uncertainty: survey and research potentials / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bi-objective resource-constrained project scheduling with robustness and makespan criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4248938 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty / rank
 
Normal rank
Property / cites work
 
Property / cites work: Genetic local search for multi-objective combinatorial optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: A critical activity reordering heuristic / rank
 
Normal rank
Property / cites work
 
Property / cites work: A population-based approach to the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid genetic algorithm for the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q2723294 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 13:02, 6 July 2024

scientific article
Language Label Description Also known as
English
A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations
scientific article

    Statements

    A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    11 June 2013
    0 references
    Summary: We study resource-constrained project scheduling problems with perturbation on activity durations. With the consideration of robustness and stability of a schedule, we model the problem as a multiobjective optimization problem. Three objectives-makespan minimization, robustness maximization, and stability maximization-are simultaneously considered. We propose a hybrid multiobjective evolutionary algorithm (H-MOEA) to solve this problem. In the process of the H-MOEA, the heuristic information is extracted periodically from the obtained nondominated solutions, and a local search procedure based on the accumulated information is incorporated. The results obtained from the computational study show that the proposed approach is feasible and effective for the resource-constrained project scheduling problems with stochastic durations.
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references