An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework (Q2393122): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s00291-012-0304-5 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2007080167 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q2747613 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimizing the quality control station configuration / rank
 
Normal rank
Property / cites work
 
Property / cites work: A polynomial time algorithm for solving a quality control Station configuration problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Inspection resource assignment in a multistage manufacturing system with an inspection error model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Shortest Route Models for the Allocation of Inspection Effort on a Production Line / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach / rank
 
Normal rank

Latest revision as of 17:16, 6 July 2024

scientific article
Language Label Description Also known as
English
An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework
scientific article

    Statements

    An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework (English)
    0 references
    0 references
    0 references
    7 August 2013
    0 references
    production
    0 references
    quality management
    0 references
    inspection allocation
    0 references
    serial production lines
    0 references

    Identifiers