Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints (Q367232): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(6 intermediate revisions by 5 users not shown)
Property / author
 
Property / author: Jacques jun. Teghem / rank
Normal rank
 
Property / author
 
Property / author: Jacques jun. Teghem / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90C59 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6211883 / rank
 
Normal rank
Property / zbMATH Keywords
 
permutation flowshop
Property / zbMATH Keywords: permutation flowshop / rank
 
Normal rank
Property / zbMATH Keywords
 
setup times
Property / zbMATH Keywords: setup times / rank
 
Normal rank
Property / zbMATH Keywords
 
time lags
Property / zbMATH Keywords: time lags / rank
 
Normal rank
Property / zbMATH Keywords
 
mathematical programming
Property / zbMATH Keywords: mathematical programming / rank
 
Normal rank
Property / zbMATH Keywords
 
simulated annealing
Property / zbMATH Keywords: simulated annealing / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10852-012-9180-x / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2088175624 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of scheduling problems with setup times or costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity results for flow-shop and open-shop scheduling problems with transportation delays / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the weighted number of tardy jobs on a two-machine flow shop. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing tardy jobs in a flowshop with common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: Permutation flowshop scheduling problems with maximal and minimal time lags / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and bound algorithm to minimize the number of late jobs in a permutation flow-shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions / rank
 
Normal rank
Property / cites work
 
Property / cites work: An <i>n</i> Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Polynomial time algorithms for the UET permutation flowshop problem with time delays / rank
 
Normal rank
Property / cites work
 
Property / cites work: Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two models for a family of flowshop sequencing problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The flow shop problem with time lags and separated setup times / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 22:48, 6 July 2024

scientific article
Language Label Description Also known as
English
Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints
scientific article

    Statements

    Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints (English)
    0 references
    0 references
    0 references
    0 references
    26 September 2013
    0 references
    permutation flowshop
    0 references
    setup times
    0 references
    time lags
    0 references
    mathematical programming
    0 references
    simulated annealing
    0 references

    Identifiers