General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach (Q497626): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 4 users not shown)
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 68T20 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6485255 / rank
 
Normal rank
Property / zbMATH Keywords
 
scheduling
Property / zbMATH Keywords: scheduling / rank
 
Normal rank
Property / zbMATH Keywords
 
general flowshop scheduling problem
Property / zbMATH Keywords: general flowshop scheduling problem / rank
 
Normal rank
Property / zbMATH Keywords
 
sequence-dependent setup times
Property / zbMATH Keywords: sequence-dependent setup times / rank
 
Normal rank
Property / zbMATH Keywords
 
total weighted tardiness
Property / zbMATH Keywords: total weighted tardiness / rank
 
Normal rank
Property / zbMATH Keywords
 
heuristic
Property / zbMATH Keywords: heuristic / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ins.2013.06.025 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2062923083 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of scheduling problems with setup times or costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new constructive heuristic for the flowshop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Worst-case and numerical analysis of heuristic algorithms for flowshop scheduling problems with a time-dependent learning effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525911 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Permutation vs. non-permutation flow shop schedules / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for the flow line problem with setup costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benchmarks for basic scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 19:15, 10 July 2024

scientific article
Language Label Description Also known as
English
General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach
scientific article

    Statements

    General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach (English)
    0 references
    0 references
    24 September 2015
    0 references
    scheduling
    0 references
    general flowshop scheduling problem
    0 references
    sequence-dependent setup times
    0 references
    total weighted tardiness
    0 references
    heuristic
    0 references

    Identifiers