Minimizing the total completion time in a distributed two stage assembly system with setup times (Q337027): Difference between revisions
From MaRDI portal
Revision as of 21:46, 12 July 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Minimizing the total completion time in a distributed two stage assembly system with setup times |
scientific article |
Statements
Minimizing the total completion time in a distributed two stage assembly system with setup times (English)
0 references
10 November 2016
0 references
scheduling
0 references
distributed two-stage assembly flowshop
0 references
hybrid meta-heuristics
0 references
total completion time
0 references
0 references
0 references
0 references
0 references
0 references