Pages that link to "Item:Q337027"
From MaRDI portal
The following pages link to Minimizing the total completion time in a distributed two stage assembly system with setup times (Q337027):
Displaying 2 items.
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic (Q1651546) (← links)