A single machine carryover sequence-dependent group scheduling in PCB manufacturing (Q339574): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 4 users not shown)
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90C57 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6651730 / rank
 
Normal rank
Property / zbMATH Keywords
 
PCB manufacturing
Property / zbMATH Keywords: PCB manufacturing / rank
 
Normal rank
Property / zbMATH Keywords
 
group scheduling
Property / zbMATH Keywords: group scheduling / rank
 
Normal rank
Property / zbMATH Keywords
 
carryover sequence-dependent setups
Property / zbMATH Keywords: carryover sequence-dependent setups / rank
 
Normal rank
Property / zbMATH Keywords
 
kitting times
Property / zbMATH Keywords: kitting times / rank
 
Normal rank
Property / zbMATH Keywords
 
branch-and-bound algorithm
Property / zbMATH Keywords: branch-and-bound algorithm / rank
 
Normal rank
Property / zbMATH Keywords
 
lower-bounding structure
Property / zbMATH Keywords: lower-bounding structure / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2012.06.006 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2150049961 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Group technology approach to the open shop scheduling problem with batch setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches / rank
 
Normal rank
Property / cites work
 
Property / cites work: Group-scheduling problems in electronics manufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Principles of Sequencing and Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Just-in-time scheduling. Models and algorithms for computer and manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: State-Space Search / rank
 
Normal rank
Property / cites work
 
Property / cites work: Breadth-first heuristic search / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 23:04, 12 July 2024

scientific article
Language Label Description Also known as
English
A single machine carryover sequence-dependent group scheduling in PCB manufacturing
scientific article

    Statements

    A single machine carryover sequence-dependent group scheduling in PCB manufacturing (English)
    0 references
    11 November 2016
    0 references
    0 references
    PCB manufacturing
    0 references
    group scheduling
    0 references
    carryover sequence-dependent setups
    0 references
    kitting times
    0 references
    branch-and-bound algorithm
    0 references
    lower-bounding structure
    0 references
    0 references