A single machine carryover sequence-dependent group scheduling in PCB manufacturing
From MaRDI portal
(Redirected from Publication:339574)
Recommendations
- The scheduling problem of PCBs for multiple non-identical parallel machines
- Single machine group scheduling with time and position dependent processing times
- Group-scheduling problems in electronics manufacturing
- Single machine group scheduling with position dependent processing times and ready times
- Scheduling Component Placement Operations for Collect-and-Place Type PCB Assembly Machines
- A genetic algorithm approach to scheduling PCBs on a single machine
- Single machine group scheduling with resource dependent setup and processing times
- Schedule grouped jobs on parallel machines with single mold constraint
- Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm
- Single machine group scheduling with ordered criteria
Cites work
- Breadth-first heuristic search
- Group technology approach to the open shop scheduling problem with batch setup times
- Group-scheduling problems in electronics manufacturing
- Just-in-time scheduling. Models and algorithms for computer and manufacturing systems
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches
- Principles of Sequencing and Scheduling
- Scheduling
- State-Space Search
This page was built for publication: A single machine carryover sequence-dependent group scheduling in PCB manufacturing
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q339574)